Summary
- Reconstruction and repair of the drainage and curb system in front of the Legacy Garden that adjoins the community school on the Sunshine Coast is part of the rural road repair wish list.
Article overview
- The Sunshine Coast regional district released a list outlining priority projects for rural road repair and infrastructure improvements.
- The document highlights drainage improvements, curb repairs, and related drainage system upgrades as key elements of the plan.
- Additional items on the wish list include road resurfacing, shoulder widening, and enhanced traffic calming measures where appropriate.
- Community input and local council discussion are noted as part of the process to determine funding and sequencing.
Key items on the wish list
- Drainage system reconstruction and curb repairs in front of the Legacy Garden adjacent to the community school.
- Road resurfacing where pavement quality has degraded.
- Upgrades to road shoulders to improve safety for pedestrians and cyclists.
- Implementation of traffic calming or speed reduction measures in identified corridors.
- Periodic maintenance to prevent further deterioration and ensure long-term durability.
Quotes
“Reconstruction and repair of the drainage and curb system in front of the Legacy Garden that adjoins the community school on ...”.
Context
- The list represents local priorities for maintaining and upgrading rural road infrastructure on the Sunshine Coast, focusing on safety, drainage, and reliability.
- Funding strategies and timelines are not specified in the excerpt, but community engagement is implied as part of the planning process.
Author's summary
A concise city-collected plan prioritizes drainage, curb, and safety upgrades along with road resurfacing and shoulders improvement to support rural mobility on the Sunshine Coast.
more
Coast Reporter — 2025-12-03